Building Layout

Building Layout Surveys

  • Block Surveys to establish right-of-way limits of downtown city blocks.
  • Column Line and Building Corner Staking.
  • Pile, Pile Cap & Footing Staking.
  • Pile As-Built Surveys.
  • Anchor Bolt and Template As-Built Surveys.
  • Horizontal Grid and Vertical Control for multiple floors & roofs on metal decking & concrete decking.
  • Steel & Concrete Column Plumb Reports.
  • Mullion Alignment Surveys.
  • Utility & Finish Grade Staking.

Past Projects:

CAL-EPA Headquarters
10th St. & I St., Sacramento CA (26 Stories)

UC Davis Tower II
X St. & Stockton Blvd., Sacramento CA (14 Stories)

Parking Garage “C”
14th St. & H St., Sacramento CA (10 Stories)

CIM 9th & J Plaza Lofts
9th St. & J St., Sacramento CA (7 Stories)

East End Complex
15th St., 16th St., L St. & N St., Sacramento CA
(4 Buildings: 6 to 7 Stories & 1 Parking Garage: 5 Stories)
(4 Buildings include 2-Story Underground Parking Garage)

Essential Services Building
East Weber Ave., South El Dorado & North Center St., Stockton CA
(1 building: 6 Stories & 1 Parking Garage: 7 Stories)

Caltrans District 3 Headquarters
B Street & 7th Street, Marysville CA (5 Stories)

Cal-PERS Expansion
3rd Street & Q Street, Sacramento CA
(foundation only, including 2-Story Underground Parking Garage)

Crown Corporate Center
Gateway Oaks Drive, Sacramento CA
(3 Buildings: 3 to 4 Stories)

Pleasanton Corporate Commons
Stone Ridge Mall Rd. & Embarcadero Ct., Pleasanton CA
(4 Buildings: 5 Stories)

Mather Field Veterans Hospital Expansion
Lower Placerville Rd. & Peter A. McCuen Blvd., Rancho Cordova CA
(7 Stories)

Specializing in High-Rise Layout!